Whistler Blackcomb – Embedded Day Four

Day 4 of Mike Douglas’ wait for winter on top of Whistler was a busy one. Mike D sees another storm brewing and meets with patrol to get the mountain ready. Things get a little windy that night but provide plenty of fresh turns for him the next day. Watch Day 4 of “Embedded” below.

Day 4 – Count Down

As opening day gets closer the pressure is on to get the mountain ready. Patrol puts pro skier Mike Douglas to work in the race against time before the storm sets in. Then, with winds gusting up to 142km p/h Mike finds out just how much his hut Embedded at the top of Whistler Mountain can take.

<embed src="http://vimeo.com/moogaloop.swf?clip_id=32320554" type="application/x-shockwave-flash" width="400" height="300"></embed>